This is the floor of the living room with insulation and heating pipe in place. The pipe gets hooked up to a small hot water tank and circulating pump. Tomorrow it all gets covered up when we pour the concrete slab.

The group shot is a gathering of friends and family for a salmon bbq on Sunday evening. The 16lb Chinook salmon was courtesy of Simon who caught it while working as the chef at Sunds Lodge on Malcolm Island this summer.

And the last shot is of the big cedar beam that will grace the front of the upper deck support frame.