Champion digger operator Sylvie Rousseau at work filling the drainage ditch across the field. She also did most of the ditch digging including the 200ft stretch from the pump to the pump house and the tricky stretch through the woods to the workshop. David finished the job this afternoon with a complex three way ditch arrangement by the workshop. Sme hand digging is still required but the bulk of the hard work is done.

Today was also a significant day because BC Hydro showed up and connected the new service. Yeah!